← Back to Intelligence

NVIDIA GTC 2025: Rubin Roadmap Unveiled

Date: March 18, 2025
Company: NVIDIA
Category: Hardware & Infrastructure

Narrative

Roadmap through 2027 revealed. Rubin (2026 H2): 50 petaflops FP4, 3.3x vs Blackwell. Rubin Ultra (2027 H2): 100 petaflops, 1TB memory. Annual cadence confirmed.

NVIDIA

Reality

Roadmap transparency enabled multi-billion-dollar datacenter planning. Rubin production announced Jan 2026. Hyperscalers committed publicly. AMD competitive response immediate.

Implication

Annual architecture cadence unprecedented in HPC. Locked customers into long-term NVIDIA ecosystem. 600kW Kyber racks forced datacenter infrastructure redesigns. Competition intensified.

Tags

  • nvidia
  • gpu
  • chip-design
  • infrastructure